Questions regarding PPA (For Investor)
- How is the PPA Unit Rate defined?
- Percent of GST applicable on the invoices that an investor raises per month against the units sold?
- How many percent returns does the investor consider per annum?
- On what basis are the returns considered?
i.e. On the Basic Cost i.e. Excl. GST Or including Insurance Amount Or Including maintenance Cost Or Including everything? - How much amount does the investor consider to get at the end of the PPA tenure.
i.e 2 times more than what is invested or what - Bank Guarantee decided on what basis?
- Security Deposit?
- What is the insurance amount of the project cost? (In terms of %)
- Maintenance Amount per kW per Year of the Project?
- Who gets to avail the Depreciation?
- How is Buy Out calculated? Clarification needed
- How is Lock in Period decided?
- How is a SPV prepared? Clarification needed
- How much % of the share must be developers’ name?
- What is Captive
- What is Group Captive
- Who gets carbon credits?
- Whom can we sale those credits?
Group Net-metering | Policy is yet to be implemented
- If there is requirement of 100kW at the location 2 but the sanctioned load is 50kW & can I install a 100kW System at the location 1 where I want to install Solar? Or do I have do load extension at location 2?
- Is there any 15 min time block concern while installing Solar through Group net-metering?
- If the Location 1, where I want to install solar in not under ambit of TOD i.e. it is below 20kW and the location 2, where I want to use the power, there is a need to 5kW, will the meter of location 1 meter be considered in TOD? Will I have to do load extension?
- If there is requirement of 50kW at the location 2 and transformer in that location have exceeded the capacity of Solar, can I install Solar at location 1?
- If there is requirement of just 2kW at the existing location but I have requirement of 300kW at my 5 different locations, can I install a Solar System then? (Sandeep)
- How much charges I need to pay per unit, if I install a Solar System off site? Is there any difference in this Group Net-metering & Open Access
- Can I install solar system at 2 different locations for 4 different Meters of same name (Pravara)
- How is Group Net-metering different than Open Access?
- What should be same, Consumer Name or Company Name or same Director?
- Is there any extra process that I have to do, for group net-metering?
- If Location 2 is a residence & I want to install a Solar System at location 1, can one claim benefit of Subsidy?
- Can one get loan if he wants to install Solar System at Location 1 and get its benefit at location 2?
Electricity Bill Before installing Solar
- What are the things we need to look in electricity bill before installing solar?
Contract Demand
Sanctioned Load
Usage of units in 3 zone excluding peak hour zone - How to calculate system required from Electricity Bill
- Contract Demand Criteria?
1. What if the Contract Demand of the electricity bill is lesser than Solar Capacity we want to install?
2. What about the Demand Charges, do we need to pay as per the Solar Plant or as per the load? - Sanctioned Load Criteria?
1. What if the Sanctioned Load of the electricity bill is lesser than Solar Capacity we want to install?
2. Do we need to increase the SL according to the Solar Plant? - 15 min slot criteria?
- Above what capacity we can install an Open Access Plant?
- What are the taxes customers’ needs to pay per unit?
How much are the wheeling charges, cross subsidy sub-charges, etc? - What if the units generated are not utilized in that month itself?
- What about peak hour usage?
- What happens if there is load shedding in the factory and units generated are not utilized?
- Can you please share electricity bills of 3-4 customers who have installed Open Access Project below 1MW and above 1MW?
- Can we bank the units? What are the charges
- Customer gets benefit after installing an Ethanol Plant, is there any benefit for solar as well?
- If a customer has already installed a solar system at his premises under netmetering, can he avail benefits of Open Access?
- Same question for Behind the Meter?
- Involvement of Prakashgad?
- How much time is required for the whole process
- Can an Open Access customer opt for only Net-metering in future (If his demand reduces)
In his own premises he can - Is there any zone wise criteria?Like net-metering
- Are the units carried forward after a month or after Financial Year End?
Banking Charges are levied of 8%. - Is there any exemption agriculture or residential plants?
- Can MSEDCL give permission for a consumer who has only been using their power since 2-3 months and not whole year
- Is there any different criteria for seasonal industries
- Who cannot go for Open Access
- If a customer is availing benefit of ED Exemption will that exemption still be considered after installing Open Access
- Can we install Solar System below 1MW?
- What are the parameters that get affected if the Solar Plant is below 1MW & above 1MW
15 min slot criteria after launching GOA - Sugar Factories can install Solar through SCADA System | Ultra tech has recently installed it
Land
- What is the basic factor to be looked while purchasing land for Solar
- How much area is required per MW
- If the Land is to be rented, how much rent should we pay the land owner?
- How much % rent can be increased per year?
- If the process is done by us, do we deduct that amount from the rent?
- Cost of leveling the land
- What if the land is uneven?
- Do we increase the rent per year?
- What if the customer do not pay the rent?
- Please provide a rental agreement between the land owner and the developer or the land owner and purchaser
- Do we need to make soil test? Where do we get these tests done from?
- If one party is interested to rent out his land for Solar, what kind of document we need to make between us and the owner? Any MoU or LOI type?
- What if there different 7/12 of the landowner?
Forest Department permission? - Rural Substation is not beneficial for Open Access.
- Most beneficial sub-station is 132/22KVA
ROW
- How much amount do we need to pay the land owner where poles are going to erected?
- How much land is acquired under one pole?
- Is it one time settlement cost or recurring cost?
- How much amount do we need to pay to MSEB for this process?
- Can you please provide an agreement copy of ROW between the farmers?
Time required developing a solar park
- What things we need to do before developing a Solar Park?
- What is Grid Connectivity?
- For how much time is grid connectivity valid?
- What if the time taken to develop the park goes beyond the time limit for Grid Connectivity
- How much charges are required for Grid Connectivity?
- Can I meet clients who want to purchase electricity from us? By keeping the permissions ready
- Would be good if I get a PPA Agreement
- Are there any nearby Solar Parks? Can we visit these parks?
- Material List
- Scope of Work
- How many LA are required?
- Weather Monitoring
- What if we do not get resistance for earthing?
- Is there any road width criteria
Regulations
- How much % Banking Charges are applicable on Unit exported?Are units lapsed if they are not used in 15 min slot?
- Or is it like Net-metering?
- If I want to supply 5 plants of 200kW i.e. 1MW, do I have to use separate meters each or it will be divided only on paper?
- What are the factors to see if the Load is HT or LT?
To get
- Quotation of Solar Open AccessGeneration Report
- Electricity Bills of the consumers purchasing power through Open Access
- GRs we need to study
- Companies dealing in Open Access
- Project Reports
- PPA Agreements of some customers
- How big is the market
- Can we start meeting Builders, Clients?
- How much time is required to develop the whole project
Opportunities
- Can we meet Housing Societies to opt for Open Access? Townships
- Malls
- Hospitals
- IT Companies
- Stone Crushers
Costing
- Is there any kind of subsidy to install Open Access Plant?
- Loan availability